Site Map
>>
Press releases
PC Gold Announces Change in Chief Executive Officer
Peter J. Hooper Joins the Board of PC Gold
PC Gold Secures Senior Executive as Chief Operating Officer to Drive Underground Exploration Phase at Pickle Crow
PC Gold Inc. Files Year End Financial Statements, MD&A, and AIF for the 12 Months Ended June 30, 2011
PC Gold Ramps up Major Shallow Drill Program on the Core Mine Trend; up to 22,000 Metres and 105 Holes Planned
PC Gold Releases Latest Central Pat East Drilling, Summarizes Results to Date and Plans all-Weather Road to Discovery Site
Jean-Pierre Chauvin Joins Board of PC Gold in Support of Development Push at Pickle Crow
PC Gold Drills 254 Metres of 0.78 g/t Gold at Central Pat East, Including 106 Metres of 1.0 g/t Gold and 6 Metres of 7.67 g/t Gold
PC Gold Commences Preliminary Economic Assessment for Pickle Crow Gold Project
PC Gold Drills 373 Metres of 0.58 g/t Gold at Central Pat East, Including 97.85 m of 1.03 g/t and 11.00 m of 4.28 g/t
PC Gold Files Technical Report for 1.26 Million Ounce Pickle Crow Gold Project
PC Gold Drills 251 Metres of 0.82 g/t Gold at CPE; Commences Development Permitting for Underground High Grade Resources (1.1 Million Ounces at 5.4 g/t) in Pickle Crow Mine
PC Gold Announces Initial 1.26 Million Ounce Gold Resource for Pickle Crow
PC Gold Discovers Largest Gold-Arsenic System Ever Drilled in Pickle Lake Camp; Wide Near Surface Intercepts up to 0.70 g/t Gold Over 137.50 m Including Multiple High-Grade Zones Such as 5.36 g/t Gold Over 9.02 m; Open in all Directions
PC Gold Closes $10 Million Bought-Deal Offering
PC Gold Increases Size of Bought-Deal Offering
PC Gold to Raise $5 Million Through Bought-Deal Offering
PC Gold Drills Multiple High Grade Gold Intersections in No. 19 Vein, Including 260.38 g/t Over 0.60 m (7.60 oz/ton Over 1.97 ft); 68.03 g/t Over 0.90 m and 15.70 g/t Over 2.08 m
PC Gold Unfolds New Near-Surface Gold Discovery at East Cohen-MacArthur; Multiple Mineralized Intercepts in all Holes Drilled to Date
PC Gold Drills 137.22 g/t Gold Over 1.95 m (4.00 oz/ton Over 6.40 ft) in the New High Grade No. 19 Vein, Including 380.12 g/t Gold Over 0.45 m (11.09 oz/ton Over 1.48 ft)
PC Gold Inc. Files Year End Financial Statements, MD&A, and AIF for the 12 Months Ended June 30, 2010
PC Gold - Drilling of Large-Scale Cohen-MacArthur Zone North of Mine Returns Encouraging Results; Planning for Follow-up Holes Underway
PC Gold Considerably Expands No. 19 Vein Discovery; Multiple New Gold Zones Discovered; Doubles Known Extent of Historically Top Producing (+500,000 oz) No. 1 Vein Below Workings
PC Gold Closes $9.1 Million Private Placement
PC Gold Increases Size of Private Placement
PC Gold Announces $7 Million Private Placement of Flow-Through Shares; Adds Fourth Drill to Exploration Program
PC Gold Drills Record High Grade Gold Intersection, Cuts 43.28 g/t Gold Over 13.13 m (1.26 oz/ton Over 43.1 ft) in the New No. 19 Vein, Including 138.89 g/t Gold Over 4.00 m (4.05 oz/ton Over 13.1 ft)
PC Gold Hits Abundant Visible Gold in Two Thick Intercepts of the Newly Discovered No. 19 Vein; Drills 8.23 g/t Gold Over 7.6 Metres; Assays Pending for Second Hole
PC Gold Hits Highest Grades on Record in Deep Drilling Below Shaft 1 Workings; 134.26 g/t Gold Over 3.20 m (3.92 oz/ton Over 10.5 ft) Including 838.14 g/t Gold Over 0.50 m (24.45 oz/ton Over 1.6 ft)
PC Gold Continues to Intersect New High Grade Veins; Starts Drilling Major Cohen-MacArthur Structure
Conduit Continues to Deliver High Grade Gold Values Near Surface and First Hole of Winter Exploration Program Discovers a New Vein
PC Gold to Drill More Than a Dozen New Shallow Targets in First Quarter; Adds Third Drill to Program
PC Gold Closes Financing
PC Gold Adds Flow-Through Component to Previously Announced Financing
PC Gold Announces Financing
PC Gold Expands Conduit Discovery, Number of Conduit Gold Zones Increases to Three
PC Gold Hits Bonanza-Grade 3.27 oz/ton Gold Over 3.8 Feet (112.15 g/t Over 1.15 Metres) in Deep Drilling at Pickle Crow
PC Gold Starts Deep Drilling at Pickle Crow, Provides Exploration Update
PC Gold Discovers Large New Gold Zone at Pickle Crow; Hit in 8 Holes from Surface to 500 Metres Down-Plunge; Robust Widths and Grades
PC Gold Opens Up Pickle Crow With Discovery of Gold in Confederation Rocks; Drills Thick Temiskaming-Like Conglomerate Sequence
PC Gold Closes Private Placement for $2.4 Million
PC Gold Announces $2.4 Million Private Placement
PC Gold Begins Drilling at Pickle Crow, Identifies Gold Target in Thick Conglomerate Unit
PC Gold to Start Phase II Drilling at Pickle Crow
Mishkeegogamang Ojibway First Nation and PC Gold Sign Exploration Memorandum of Understanding
PC Gold Inc. Files Interim Financial Statements and MD&A for the 9 Months Ended March 31, 2009
PC Gold Closes Private Placement For $2,000,000
PC Gold Announces $1.5M Hard Dollar Private Placement
PC Gold Inc. Files Interim Financial Statements and MD&A for the 6 Months Ended December 31, 2008
PC Gold Hits New High-Grade Gold Zones in PC-08-027, Including 36.00 g/t (1.05 opt) gold over 0.50 m (1.6 ft), 26.60 g/t (0.78 opt) gold over 0.44 m (1.4 ft), and 23.3 g/t (0.68 opt) gold over 0.60 m (2.0 ft)
PC Gold Cuts Deep High-Grade Gold at Pickle Crow, Including 52.7 g/t (1.54 opt) over 0.60 m (2.0 ft) and 31.90 g/t (0.93 opt) over 0.5 m (1.6 ft)
PC Gold Cuts Three Separate Gold Zones in Hole PC-08-020 Returning 3.90 m of 17.39 g/t Gold, 13.50 m of 4.03 g/t Gold, and 5.30 m of 4.99 g/t Gold
PC Gold Inc. Files Interim Financial Statements and MD&A for Period Ending September 30, 2008
PC Gold Hits High Grade Gold at Pickle Crow Gold Mine; Deepest Hole Ever Drilled on Property Intersects Visible Gold, Assays Pending
PC Gold Clarifies Disclosure Regarding Gold Zones in October 7, 2008 News Release
PC Gold Defines 11.7 Million Cubic Metres of Gold Zones at Pickle Crow Mine, Open for Expansion
PC Gold Announces 2008 Year End Financial Results
Second Drill Arrives at PC Gold’s Pickle Crow Gold Mine Property, Surface Sampling Returns up to 179 g/t (5.22 oz/T)
PC Gold Starts Drilling at Historic Pickle Crow Gold Mine
PC Gold Prepares for Start of 45,000 Metre Per Year Drill Program on Pickle Crow Gold Mine Property
PC Gold More Than Doubles Size of Pickle Crow Gold Property, Now Holds Commanding Position in Pickle Lake Camp Core Areas
45,000 Metres With 3 Drills Planned For PC Gold's Pickle Crow Gold Mine Project
PC Gold Inc. Files Interim Financial Statements and MD&A for Period Ending March 31, 2008
PC Gold Completes Initial Public Offering and Acquisition of Pickle Crow Property
Back to top
PC Gold Announces Change in Chief Executive Officer
Ottawa, Ontario – December 12, 2011 -
PC Gold Inc. (TSX: PKL)
(“PC Gold” or the “Company”)
announces that eff...
more
Peter J. Hooper Joins the Board of PC Gold
Ottawa, Ontario – November 1, 2011 - PC Gold Inc. (TSX: PKL)
is pleased to announce that Mr. Peter J. Hooper has joined the...
more
© 2011 PC Gold. All Rights Reserved.
Site Map