|
PC Gold Drills 254 Metres of 0.78 g/t Gold at Central Pat East, Including 106 Metres of 1.0 g/t Gold and 6 Metres of 7.67 g/t Gold | | | | Ottawa, Ontario – July 25, 2011 - PC Gold Inc. (TSX: PKL) is pleased to report that drilling in the core area of the newly discovered shallow gold system at Central Pat East (“CPE”) continues to deliver (see hole PC-11-141 and 145 results, below) a well-established pattern of very broad low grade intercepts encompassing higher grade shoots. Moreover, step out drilling also continues to expand the known strike extent of the CPE gold-arsenic system. Holes PC-11-140 and 143, drilled 300 and 200 metres respectively to the southwest of the core discovery area, both cut significant mineralized widths... Click here for a full pdf copy of this press release. | | |
|
|
| |