Property >> Drilling 2008 - Maps, Sections


 

DRILLING - 2008 - MAPS, SECTIONS, PHOTOS etc


Move cursor over each image to view caption.  Click to expand.

Note: Higher resolution versions of some of these maps and images can be downloaded from Property / Key Document Downloads 

Click here to view 3D models & screen captures of historical workings and key targets











Shallow Drill at Work, Albany Shaft Area, Pickle Crow, Sept. 2008

Sawn Core and Racks, Pickle Crow, Sept. 2008


Drill Hole Casing & Cap, PC-08-06, Pickle Crow, Sept. 2008

Deep Drill Site PDDH21, Pickle Crow, Sept. 2008

Deep Drill Site PDDH21 at Sunrise, Sept. 2008

Deep Drill on Site of PDDH21, Pickle Crow, Sept. 2008


Shallow drill and NQ core barrels, No. 5 BIF

Shallow drill at work, No. 5 BIF

Driller at work

Driller at work, shallow drill, No. 5 BIF

Drill site, shallow rig, No. 5 BIF

New core racks, PC Property

Core racks & fresh core, PC Property

Back to top


PC Gold Hits Abundant Visible Gold in Two Thick Intercepts of the Newly Discovered No. 19 Vein; Drills 8.23 g/t Gold Over 7.6 Metres; Assays Pending for Second Hole


Ottawa, Ontario – March 8, 2010 - PC Gold Inc. (TSX: PKL) is pleased to report that additional drilling on the newly dis...more


PC Gold Hits Highest Grades on Record in Deep Drilling Below Shaft 1 Workings; 134.26 g/t Gold Over 3.20 m (3.92 oz/ton Over 10.5 ft) Including 838.14 g/t Gold Over 0.50 m (24.45 oz/ton Over 1.6 ft)


Ottawa, Ontario – February 22, 2010 - PC Gold Inc. (TSX: PKL) is pleased to report that deep drilling below the Shaft 1 ...more